I | | Nh | Ih— M—N ofr AF Er acrtt Th "DISTRICT HEATING PLANT FOR ST.JOHNS, MICH. A THESIS BY Le C. HULSE AND Le Je FAIRCHILD. TSE East Lansing, Mich., May 15, 1914. To the Mayor and City Council, St.Johns, Mich. Gentlemen: We have the honor to submit herewith a report in de- tail of our investigations regarding the advisability of add- ing a district heating system to your city's present power plant. Our first step in the investigation was to canvass the business district and determine the possible business avail- able and the amount of heat required to properly serve the same . We then inspected the plant and collected data on it's equipment and operation of the past year, and calculated the heat available in the exhaust steam from the plant and found it to be amply sufficient for our purpose. Following this we determined the pipe size to be used, and the style of conduit best adapted for the work in hand. Next we made maps of the business district, and a pro- file of the grade line for the entire length of the conduit. These gave us details from which to calculate the complete cost of installation. Knowing the cost os installation and the probable life of the system, we were able to determine the yearly expense of operation. Finally by canvassing some representative business 264837 men as to present heating costs, we were able to set an equit- able rate, and thus determine the revenue from the heating system. Subtracting from this the expense of operation, we obtained the probable profit, which, to us seems more than sufficient to warrant the installation of the system. Appended hereto are the principal data which form the basis for the work, the computations based thereon, maps, profiles, estimates etc. pertinent to the investigation. Very respectfully submitted, Le C. Hulse and Ie Je Fairchild. PRESENT PLANT EQUIPMENT. Two- Gordon Steam Pumps. (Compound) Size Cylinders 10"x10" and 22" x 10" Average Speed 17 RPM. Time Used Per Day 24 Hr. One-=- Knowles Air Compressor. Size Cylinder 10"x12" Used only for heavy demand. One- Ingersol Air Compressor. ‘Size Cylinder 10" x 14" Average Speed 80 RPM. Time Used Per Day 24 Hr. One- Skinner Engine, 150 H.P. Size Cylinder 14°x15" Average Speed 242 R.P.M. Time Used Per Day 10 Hr. One- Corliss Engine, 185 H.P. Size Cylinder 16* x36" Average Speed 102 R.P.M. Time Used 14 Hr. Three- Wickes Horizontal Boilers, 100 H.P. Each. NECESSARY ADDITIONAL EQUIPMENT. One- Wickes Vertical Boiler, 350 H.P. (Needed for present requirements, ) #9 N.E. CORNER of POWER PLANT. WEST SID of POWER PLANT, 150 H.P, SKINNER and INGERSOLL AIR COMPRESSOR, 185 H.P. CORLISS ENGINE, GORDON WATER PUMPS, ESTIMATION OF CUBIC CONTENTS OF BUILDINGS TO BE HEATED. _— The average store building is two stories high, each floor being 22'x104'x13', giving 59,500 cu.ft. or approx- imately 60,000 cu.ft. for the cubic contents of each store building. There are 75 sueh stores. 75 x 60,000 gives 4,500,000 cueft. for the cubic contents of all the business district. One sq.ft. of radiating surface will heat 100 cu.ft. in zero weather, therefore 45,000 sq.ft. of radiation will be sufficient. The amount of heat necessary to heat one sq.ft. of radiation one hour in zero weather is 255 B.T.U. and since. 15% of the heat at the plant is lost in transmission, there- fore 45,000 x 255 gives 13,300,000 B.T.U. necessary at the °85 plant. TOTAL HEAT IN EXHAUST STEAM AVAILABLE. Exhaust steam is figured as having a quality of 85%, and an available B.T.U. of 903.7 per pound, at 5f gage. GORDON STEAM PUMP. 10 x 10 x .785 x 10 x 17 x 4 x 60 x .2577 x 903.7 17238 equals 432,000 B.T.U. INGERSOL AIR COMPRESSOR. 12 x 12 x .785 x 14 x 160 x 60 x .2577 x 903.7 1728 equals 2,450,000 B.T.U. SKINNER ENGINE. At 307 steam per H.P. Hr, 150 x 30 x 903.7 equals 4,600,000 B.T.U. CORLISS ENGINE. At 217 steam per H.P. Hr. 185 x 21 x 903.7 equals 3,550,000 B.T.U. | AVERAGE OF CORLISS & SKINNER. (4,600,000 plus 3,550,000) divided by2 gives 4,075,000 B.T.U. TOTAL B.T.U.e MINIMUM IS 6,957,000 MAXIMUM B.T.U. AVAILABLE. SKINNER ENGINE. At 357 steam per H.P. Hr. 200 x 35 x 903.7 equals 6,320,000 B.T.U. CORLISS ENGINE. At 254 steam per H.P. Hr. 247 x 25 x 903.7 equals 5,600,000 B.T.U. AVERAGE OF CORLISS & SKINNER. (5,600,000 plus 6,320,000) divided by 2 gives 5,960,000 B.T.U. (Gordon Steam Pump and Ingersol Air Compressor same as before) TOTAL B.T.U. MAXIMUM -- 14,802,000 This is more than sufficient for the heating system. DETERMINATION OF PIPE SIZE. Plotting curve from table #36 in Hoffman's Handbook gives the result that a 10" pipe 3,000ft. long will carry 220# of steam per minute. Since 1# of exhaust steam at 57 gage will supply 3 sqft. of radiation, 45,000 gives 2507 steam per min. Therefore the above 10" pipe will carry 91% of the total possible load, and since only 60% of possible bus- iness will be connected on in the first five years (see Gifford), this size will surely be ample. We will then use a 10" main with a 6" return pipe for the long run. For other pipe sizes see plan view of street. STYLE OF CONDUIT. For style of conduit see drawing between pages 6 & 7. Wrought iron pipes are used throughout with screwed joints except at expansion joints, where flanged joints will be used. Service tees and nipples are extra heavy service type. Manholes are placed at each expansion joint. PE COVERING W.I. Pi PE —— CONCRETE CONCRE od CONCRETE CRUSHED RO DRAIN PIPE PIPES .AND CONDUIT COST OF INSTALLATION. Excavation @ 40¢ per cu.yd. Excavation for main line 2,439 cueyd. Excavation on branches 710 * Total 3,149 * Raising and replacing pavement. @ $1.19 per yd. $1,100.00 New brick @ $17 per M. 31.50 gidie Conduit in place @ $7.50 per ou.yd. 434 ou.yds. $3 , 250.00 Wood Covering, @ $50.00 per M. 8,880 ft. $ 444.00 Drain Tile @ $15. per M. 3,544 ft. $ 653.20 Crushed Stone @ 60¢ per cu.yd. 131 cu.yds. $¢ 78.50 Rollers and Anchors, @ $2.50 each. 177 needed $ 443.50 Manholes, @ $25.00 each. 7 needed $ 175.00 Pipe and Fittings. 2250 ft. of 10" »880.00 526 ft. of 8" 526.00 3018 ft. of 6" ,030.00 626 ft. of 4 1/2" 234.00 768 ft. of 3 1/2" 254.00 1060 ft. of 3" 284.00 1060 ft. of 2" 140.00 7-10" Expansion Jts. 917.00 $1,260.00 $1,131.50 $3,250.00 $ 444.00 $ 53.20 ¢ 78.50 $ 443.50 $¢ 175.00 Pipe & Fittings Cont'd. 3-8" Expansion Jts. 11-6" 7 3-4 1/2" " - 4-3 1/2" " " 6-8" Service Tees 18 <6" " fn 6-4 1/2" +" . 13-3 1/2" " * 1-10" Gate Valves 1-6" " " 38-3" Wyes 38-2" . 6-8" Nipples 13-6" = 6-4 1/2" " 13-3 1/2" " 19-3" Plain Tees 19-2" t nr Diatomaceous Covering. 2250 ft. 526 ft. 3018 ft. 526 ft. 768 ft. 1600 ft. 1600 ft. Labor of Laying of 10" @ 52¢ of 8" @ 44 Pipe. 148.00 272.00 54.00 45.00 77.00 93.00 23.00 45.00 26.00 12.00 47.50 41.80 5.40 9.10 2.40 2.60 59.40 20% of (8,279.40 plus 3,004) equals Total Cost of Line. Add 10% incidentals ESTIMATED TOTAL cosT. 0,374.20 2,037.40 9411.6 $8 .279.40 $3,004.00 $2,256.00 0,374.20 2,037.40 2,411.60 $22,500.00 FIXED CHARGES. Depreciation 5% Repairs and Upkeep 1% Interest on Invst. e 12% of $22,500.00 equals $2,700.00 per year. INCOME. 60% of business connected on in five years, or 45 stores. Radiation per average store, 600 sq.ft. Present cost per store per season, $250.00 Proposed rate of 30¢ per sq.ft. per season, or $180 per store. Total Income, 45 x 180 equals $8,100.00 per annum. PROFITS. TOTAL INCOME $8,100.00 TOTAL EXPENSES $2,700.00 PROFITS $5 , 400.00 CONCLUSIONS. In conclusion we feel safe in saying that the above installation would be very advisable, not only as a source of revenue from the heating system alone, but also as a means of remedying the present inefficient operation of the whole plant, which with the present pumping equipment is unavoidable. ee | M4 a MJ | a es og es : N sage Re | v ny 7 v < ‘3 u © Es a) : es Vd dem area = be cm Gate Ped Wc | , . 4 } ea & ae oe S ee aah (i en A x of ) meas a a; aa aes aE ae OL en SE Sn 188 ——____- : os ay oes + + et ee Re GT (aa a aS a re el 5 N ae oe es i : © i » « relurns— 2" re Le aed kK B (OA NCY: 9 in ) t e 4 5 0 Wo eae a ee . SS 2/3 /2 a de fe ae ey ea Pcs BY w my - p % S) rl * E S a } & a) OE a RS ry M E % ri | ae as r a ee ik e | 4 Sica gat “Oat y nN NN Ba eho X Cross ee a haa) x+ ® ae Ae Oe es Si or : ee rs Be rea es ae : a z m-) me oS) LAR TR = : ¥ Travis * Farr A nate sires ‘ + _————— Slate Bank —> 1S h— Fa 4} i. en tela eh (= % MAL d. | af ad eee ed | Chapin : : Sar ra Si | Hicks ' S| [+ >. 7a Tatra e 8 yo ei cera) “ a ; ¥91/ ee 2 a is + r ri | Md oo te » & s & Breisen a Ss Hulse Bros Cross Ken Sickle cb A Lag Set oer f a x Ay 29 oy fas 7-7 ae heya Ss o— i “i a Ge— vIrTS ea) Ayddeg 9 4 . My - e ie Cae ed (a M4 u Ww i u PU] | ? ae Na PPT Are ree A << aT > $= 359 — ——__— Cross Feeders —3" sal bald a Sy See te | Ciinlon Ave , c S . SS Neca Ere EE ia (Ds. Sa S Se ga ; RS Sie lé °F st RK q + | Q " t . CAML L) Ds ort ta oa 1 X Cross L iii aT 3 1293 03061 8 478