i HATA | IVAN | WAI | | | o > = oo yy ry tH 6 = NOSNIGOU THESIS MICHIGAN AGRICULTURAL COLLEGE CAMPUS TOPOGRAPHY c. M. Stover D. K. Robinson 1921 THESIS me ve ' ‘ 7 t } MICHIGAN AGRICULTURAL COLLEGE CAMPUS TOPOGRAPHY A Thesis Submitted to The Faculty of MICHIGAN AGRICULTURAL COLLEGE By D. K. Robinson | C. M. Stover Candidates for the Degree of Bachelor of Science June 1921. —_ THESIS ¥. . es Py f I &; Eb zie: we Bp RESTA bh 4 “ah Ni %. on . ud IN BAC TABLE OF CONTENTS. were, re a5 : { Co a BS \ son a Fe ey ad os v Zz nie rele. 4 ot oe viii h hes KOPF ROOK _ + . A ~ “ a a “ a #4 7 Introduction. .cccccccccrcscccccccccsccses erage 2 Apparatus Used... ..cccccccvcccnvecsccsceces The Preliminary Work... ..ccccccccvcsccessees The TYaveree...ccccccccccccvccccscccscsene TOPOMTAPHY.. .crcccccvcsccccccssevsccccvecer CONCLUBLON. .. wc cccccvccrcerccccsccvevcsece Witnesses Of Stations... c.cccccccccrcseces Data Check Traver8@.....cccccccccccsccccevece Cloped TraverBescccccccccccccscccccccces Level Notes... ccccrccccccccscccesecsccsece Computed CoordinateB...cccccccccscvecccs Sample Computations... ccccsersccccveseces Sample Unit Sheet... ccccccccccccccccces Given Coordinates.....ssesee-+-eeee Back Triangulation Map... cccccccccceccece " Unit SHEeCtScccccvcccsccccsccccecccceces -oo0000= LO3902 o 4 » Pf 8 10 15 16 L7 18 19 20 Cover INTRODUCTION A topographical survey, if based on a system of tri- angulation, is mapped by first plotting the triangulation points. If the area is small, the convergence of the mer- idians may be neglected and the triangulation points plot- ted by means of their rectangular coordinates. The draw- ing for this purpose is ruled off into large scuares, The topography includes the shape of the ground and the location of all objects such as houses, walls, fences, water courses, catchbasins, trees, manholes, edges of travelled ways, poles, hydrants, monuments, and in fact, any object that occurs within the limits of the survey. This thesis deals with the extension of the topograph- ical survey of the M. A. C. Campus which includes complet- ing a secondary traverse control and adjusting between known points, and the taking of topography by means of the plane table. ~Lea APPARATUS USED I, Instruments: 1. Transit, reading to 30" 2. Plane Table, tripod, telescopic and sight alidade. 3. Wye level. Il. Flags or range poles. III, Tapes: 100° standard steel tape. 100° standard metallic tape. THE PRELIMINARY WORK From triangulation data previously completed, witnesses and descriptions of the following triangulation points were obtained: 9, 11, KE, Jj, 1, h, FOl, FO2, q, r, 8s, t, u, x, CXN5, CXN6, CXN7, GPl and GP2. In each case, the point was located, the witnesses verified or corrected (See page 10). with the exception of the point "q". From the witnesses and descriptions given for this point, nothing was discovered, no doubt due to the fact that the field in which said point was supposedly located had been recently plowed and several trees in the vicinity removed. Another point "q" was es- tablished for this particular survey. THE TRAVERSE 4 traverse is run with a transit by setting up the in- strument over the intersection of the sides of the traverse and measuring the angles at the intersection or by orienting on a given point and measuring the aximuth of the forward line. The side lengths or distances from point to point are measured with the tape. If a traverse is laid out so that the point of ending is coincident with the point of begin- ning, it is called a closed traverse. In any case, if the point of ending is not coincident with the point of beginning, there is an error of closure, Since, in our case the traverse work was laid out with trans- it and tape, the error is due more to the measurements with the tape than to angular measurements. The error is there- fore distributed throughout the various sides forming the traverse s0 that only the lengths will be corrected. fhe traverse is referenced to two coordinate axes at right angles to each other. One of the axes may be a meridian or a line in the traverse. This traverse was referenced to the base line of the Campus triangulation system. The projection of any line in a traverse on the meridian axis is called its latitude: its projection on the other axis is called its de- parture. The rule for distributing the error of closure is as follows: The correction in latitude or departure of any course i8 to the total error in latitude or departure as the latitude or departure of the course is to the arithmetical sum of the latitudes or departures.. As has been said, one of the axes may be a meridian line. Distances measured @long the meridian axis are known as ordinates or "y" distances and the distances along the other axis as abscissas or "x" distances. It is well to choose the base axes so that there will be no negative values for the coordinates of any point. The coordinates of an unknown point can be calculated from those of a known point if the ‘angie and distance to the unknown point from the known point are measured. Check traverses were run from CAN6 to CXN?7 by orient- ing on GPl, the azimuth of which was determined from coord- inates given us; also from CXN6 to FO1, from FOl to CXN5, h, 9, and FO2, from FO2 to x, §j, 11, and i. & closed traverse was run beginning at CXN6 and orient- ing as before, through points r, q, 8, t, u, CP2, GP1l, and CxXN6. The error of closure in degrees was 0 1' 12" which was distributed in proportion to the distance between the re- spective points. From the field data obtained, the x and y coordinates were computed (see computations pagel9 ). The error due to unavoidable causes in the x coordinates amount- ed to .25' while that of the y coordinates was 0.06'. The true azimuths of all points was then computed from the cor- rected coordinates for each point. fhe elevation of each triangulation point was deter- mined by precise leveling. Precise leveling differs from the ordinary leveling in the instruments employed and the care and refinement used in doing the work. The level may be either of the wye or dumpy type, the former type being used on this survey. The allowable error in thiga class of work according to the U. S. Coast and Geodetic Survey is 0.016 feet per mile. Since the distance around our traverse was 2782 feet, our allowable error ip 0.008 feet. However, our actual error was 0.001 feet. the elevations of the triangulation points of this traverse as determined by the above method of leveling are found in the notes on pagel’. ~6< TOPOGRAPHY There are three general methods of taking topography, namely, transit and tape topographical survey, sight alidade plane table survey, and telescopic alidade plane table sur- vey. In taking flat topography, which included the location of all objects such as houses, walls, fences, watercourses, catch basins, trees, monuments, edges of the travelled ways, poles, hydrants, manholes, and in fact any object that oc- curred within the limits of the survey, both the telescopic and the sight alidade were used. However, the sight alidade proved to be much better adapted for this class of work be- gause of the greater ease and rapidity of locating objects through the sights. Fhe method pursued in the taking of the flat topography was as follows: A sheet of drawing paper kmown as a unit sheet, upon which were plotted two or more of the known con- trol points, was attached to the board, which was mounted on a tripod. Each unit sheet was ruled into one inch squares containing 2500 square feet of area, that is, 1" = 50', ‘The sheets were made continuous by numbering every one hundred foot division consecutively from the base axes. The control points were then plotted on these sheets from the coordinates previously determined by the traverse. The tripod and board Was set over one of the plotted control points and the board levelled and oriented. In order to explain this method Clearly an example will be worked out in detail. Refer to page 20 and consider the plane table as set up over tri- angulation point 4. To orient bring the edge of the miler of the alidade in coincidence With the line AC, which joins triangulation point A with triangulation point C, and move the plane table board horizontally about its vertical axis until triengulation point C on the ground is sighted. Clamp > the board in this position. The board may be oriented in this manner by sighting on any accessible control point such as B, The objects can now be located by the intersection method. To locate the house in this example the corners nm, n, and o are sighted and the lines Am, An, and Ao, respective- ly, are drawn approximately greater in length than the actual distance to the object. In like manner, the lines from A to objects within the scope of the instrument, such as Ay, 4x, and Ag are drawn. The next step is the selection of a sub-station such as 1 from which most of the above points can be seen. To locate station 1 on the map the alidade is sighted on 1 and the line of sight Al is drawn. The dis- tance from A to 1 is measured on the ground and the corres- ponding distance is laid off to scale from A along the line Al. This definitely locates Sta 1. The board is then set up over Sta 1, levelled and oriented as explained above, using point A as a backsight. The points y, n, x, 0, and s | are then sighted and the lines ly, ln, 1x, lo, and ls respect- ively drawn on the sheet. Each point is located definitely by the intersection of the corresponding lines from Sta A and Sta 1 to the point. In a like manner as many substations as are necessary are established in order to completely locate all the objects on the sheet. -8~ CONCLUSION. The information obtained from this plane table survey Shows that the sight alidade is best adapted for this par- ticular clase of work. When the objects to be located are s0 situated that well defined intersections of the lines of sight from two or more setups are obtainable, one topographer is all that is required. However, in locating objects or buildings which are very close to each other, and angling roads, paths and streams, two topographers are required, one to chain distances and the other to plot the points. Of course, one topographer could do this alone but greater speed is obtained with a party of two. - ae an) ; CWV6 — ——w aot Grand River -Ave LOtesses y* 7% —_e-ee~ee ——e wwe —_e —eee eee nae > Q) > Lt S| > e ™~ U Le ° ano (t) PO®AS u ~~ _*—™ | — “=e | qh | 0) nese OEE eee eee @-10— Ag. Bldg ~/ \ eU0yF WADA Fo2 -ll- ~12- | PN | Path N 6,6 post eo! SA ryt | ae ly g& || J : 5 | 3 | C | i ls | A! [8 | i | Wood stake Ge South of 6x6" post B _ 4 ON - . <— — — $ x HK spond Paultey 2 | Orc 3 ~ x eb Sal gan —Oyr K XK sowwwwe XK 4. IO y “OY xe el x T x Kanne ~13- Ne (Is KR ——— X CHECK TRAVERSE was | to | “MeTared | Sgmputes cxye | GP1 | 3° 10" 41" | 3° 10" 41" CXN7 | 290°25" 15" Fol | 108°54' 00" | 108°54* 28" Fez 71°48" 15" r 103°38' 45" @ 71°42" 35" Fol CXN6 | 288°54" 00" FO2 359°27' 00" | 359°29' 25" CXN5 | 112°47' 20" Ag 47°O7' 30" h 358°33" 45" Fo2 FOl | 179°29' 25" x 0°31' 45" j 9°31' 30" FOS 3°39" 06" FOS FO4 $57 ° 09" 13" GP1 GP2 1°42' 17" ~15—< CLOSED TRAVERSE K at to Azimuth Distance (ft) CxXN6 | GP1 3°10" 41" 2 103° 38" 45" 4231.65 r q 48°51' 15" 588.20 q s 559° 48' 00" 281.00 e t 0°55" Zo" 664.70 t u £270°09' 15" 580.15 a GP2 270.01' 45" 437.50 GP2 GP1 181° 43" 45" GP1 cxne | 13°12" 15" dane FRM RK a > ME a ak FO2 FO. | 179°29" 25" x 0°31" 30" 702.80 j 9°31" 45" 263.80 ~16- LEVEL |NOTES B.8.| H.I. F.3. Elev. Sta. 857.860 CXN6 5.403 | 861.263 22555 | 858,950 r 10.838 | 850.425 q 32660 | 854.085 1.451 | 852.654 8 9.171 | 844.914 6.715 | 847,372 u 1.897 | 849.269 11.288 | 837,981 GP2 848.650 For 1.742 | 850.392 4.428 | 845.964 5 9.020 | 841.372 x ~17- LP Ol 99€1-\0b'SZart LIGSP-|BO'EL -|E'EIP1S¢/E,5 | f-20/) 0 X% 129 808/-| £9 e/er L°29L- EY C6 ZOL| MEICO | %-20S| xX JOA \0% 901 1-| 00'°G/GI+ | 3 20_+f OO*ZEZ/~| Ob FL ~ |00 EA-| OF 6G -| SOCEM $9 HS - Zef9 108° 8Z8l-| OL LIGEH 12°O -|#SLEGHNZZ'O “OL LEBYOS LEB ot ,/ OLAZIN| ASD % \668281-\96 6L42| /0'/ -| Bf OBEN 20°/ + $1084 S/0BE|S/,4.0L4 m-2z| 7 2 | 24 2G1-| OL CCST O9499-\L9 O/-| 19 HIF ELO/ -| OL ONN,0E,S8.0 | 2-S| F S lec 29//-| $¢:01924| EC o8| /o/ +|¢G0e¢lebo +|00182|,00,e460¢ S-F1 A \00'2e8 -| +6 G0924 1olBt-\O0 cbr | 20 19 S0Err| 07 '2201,9/.199%| B-Al Sw A (EbCH -| Hh2008+ 1B IO/4| 9¢G/4-| O8'10/4| OC GIF £9 1Eb) 56, SEO) A-INXA A INXAWIES -| Ob (Lte+ QNXD Intej| x we LS Ae sig) HLauizy| INIT | LMIRY -18- SAKPLE COMPUTATIONS Y of CXN6G = 7596.80 | dy of r * 4401.80 This dy is found as follows: Distance from r to CXN6 = 4231.65' Sine (103 38’ 45" - 90) # ,23592 then, dy (r) = 451.65 x .22592 # 4101.80 X of CXN6 = $3471.90 dx of r 2-419.50 This dx ig found as follows: Distance from r to CXN6 #® 431.65' cos (103 38' 45" - 90) = .97177 then, ax (r) = 431.65 x .97177 = «419.50 Correction: Total distance around traverse is 2783.2 Distanoe from r to CXN6 is 431.65' Total error of closure is 0.25' Amount of correction = 'Dist/Total dist) x error (431.65/2783.2) x 0.25 = .04 Computed dx (r) # 419.50 Corrected ax (r) = 419.50 - .04 = 419,46" Coordinates: (Y) (xX) - 696.80 + 3471.90 $+ 101.81 - 419,46 - 687.01 = 443.00 - 280.98 + 361,01 - 664,60 - 10,67 - 1827.58 + 2599.78 - __1.01 + 380.18 - 1828.59 4 2979.96 - O.21 4 437,54 - 1828.80 + 3417.50 ~19- \ > C 2-20- Aug iq?:> dl 30 45 Coordizele Data Tria ngulation 1797 ' Uash Shecks. TATE UNIVE TN 1293 0313