Source: The Mining Journal Marquette, Mi. August 18, 1838 3: m turday Service on the Extension Between the 25% of this month and the lst of September, a local train will be commenced on the middle division of the South Shore, from Nestoria to Dogwood. The grading and ditch- ing is now practically finished and the superintendent of con- struction, Mr. Latcha, is about ready to turn the new road over to the operating department. A train will probably be run west from Nestoria, connecting with the westbound morning express to Houghton and making connections at the other end with the Lake Shore for Ashland, while Bessemer, in the center of the Gogebic range is only two and a half miles away from the track, and a turnpike has been cut through. The trains will be run simply for the local business until the extension into West Superior, which will be pushed through faster than any other piece of road in the Upper Peninsula was built can be finished. SSA Passenger