Tail and dog
         The recent change of time of the DSS&A necessitated by changes on the connecting lines at St. Ignace was not followed by a satisfactory change on the Mineral Range road.
    
    Read
- In Collections
 - 
    Making of Modern Michigan
                    
 
- Copyright Status
 - No Copyright
 
- Date Created
 - 
    1889-01-05
                    
 
- Subjects
 - 
    Railroads
                    
Michigan--Upper Peninsula
 
- Material Type
 - 
    Transcriptions (documents)
                    
 
- Language
 - 
    English
                    
 
- Extent
 - 1 page
 
- Holding Institution
 - 
    Peter White Public Library
                    
 
- Permalink
 - https://n2t.net/ark:/85335/m5x061w2m